Instant documents for 2 to 4 units, from $2,000: generated from your answers and ready the moment you pay. See how it works

Options and pricing

Condo documents for Texas duplexes, ADUs, townhomes, small condo buildings and detached (site) condos of up to 12 units, at a posted price. The full package is drafted from our own plain-English forms, tailored to your answers and reviewed line by line, with drafts in 3 business days and a lawyer to call afterward. For 2 to 4 units with nothing unusual about them, instant documents are ready the moment you pay.

$2,000–$3,500 instant, 2 to 4 units $3,500–$4,000 2 units, reviewed $4,500–$10,500 3 to 12 units, reviewed

Your options

Find your project in the left column. Instant documents are generated from our standard forms and your answers and are ready when you pay, without our review; they suit projects with nothing unusual about them. The full package is reviewed by a Texas-licensed attorney and tailored where your project needs it. Not sure whether yours is a detached (site) condo or an attached condo? Here's the difference.

Your projectInstant documentsReady when you pay, no reviewFull packageReviewed by a Texas-licensed attorney, drafts in 3 business days
2 units
Detached (site) condoA house plus a detached ADU, or 2 houses on one lot$2,000$3,500
Attached condoA stacked duplex, or a side-by-side duplex drawn as an attached condo$2,500$4,000
Side-by-side site condoA duplex with the unit line down the shared wallFull package only$4,000
3 or 4 units
Detached (site) condo3 or 4 houses, or a house plus ADUs, on one lot$3,000$4,500
Attached condoA triplex, fourplex or short row of townhomes drawn as an attached condo$3,500$5,000
Side-by-side site condoTownhomes with unit lines down the shared wallsFull package only$5,000
5 to 8 units
Detached (site) condoEach unit is a home and its landFull package only$6,500
Attached condo or side-by-side site condoTownhomes or a small buildingFull package only$8,500
9 to 12 units
Detached (site) condoFull package only$8,500
Attached condo or side-by-side site condoFull package only$10,500
Add-on for instant documents
Plat reviewWe check your plat (and floor plans) against the statute and your declaration and email comments within 3 business days$750Included
Anything else
CustomMore than 12 units, commercial or mixed use, phased projects, a pool or gated street, an elevator or parking garageA fixed quote, after a short call. Tell us about your project.

What each option includes

Instant documentsFull package
Fits2 to 4 units in new buildings no one has lived in, with nothing unusual, and you check any deed restrictions yourself: the questionnaire screens out anything the standard forms don't handle2 to 12 units, including the things instant documents can't handle
DocumentsDeclaration, certificate of formation, bylaws, organizational consent, management certificate, a condominium information statement, and a filing and recording checklist, in standard languageAll of those, with the information statement drafted with you, plus a lender check, a one-page summary for buyers and a recording package
Who prepares themGenerated from our forms using your answersWe draft them from our forms, tailored to your answers
ReviewNone, unless you add plat review. We don't review your answers or title.We review every document, your plat and plans, and your recorded deed restrictions, and walk you through the drafts on a call
TimingDownload when you payDrafts within 3 business days after we have everything (see below); final documents after your sign-off
RecordingYou or your title company record, following the checklist, and pay the county's recording feesYou or your title company record, following our recording package, and pay the county's recording fees; they aren't included
Forming the associationYou file the certificate of formation and pay the Secretary of State's filing feeWe file it and pay the Secretary of State's filing fee for you
Lender consentThe consent form is attached; you get it signed before you recordA fixed-fee add-on: We prepare it and deal with the lender
Conflicts checkAfter deliveryBefore the engagement begins
Questions afterwardNot includedAnswered at no charge for 12 months after recording
Changing your mindUpgrade within 30 days and we credit everything you paid

Either way, your plat (and any floor plans) must be signed, sealed and certified before you record. What that takes. Instant terms Full package terms

What "right-sized" means

Condo documents as simple and clear as they can be: everything your project needs, nothing it doesn't, in as few words as the job takes.

A duplex isn't a mystery, and its condo documents shouldn't read like one. In our experience, most of the length in condo documents for small Texas projects comes from 2 places. The first is the statute, restated: Chapter 82 of the Property Code already covers how the condominium is run, and much of it applies whatever the declaration says. The second is stock language from a form written for a much bigger project and not tailored to this one. That second kind can work against you. A right of first refusal copied from a high-rise form, for example, can keep VA buyers from financing your units.

Meanwhile, the things that actually cause fights between a handful of owners often go unaddressed: who fixes the shared roof, who insures what, what happens when 2 owners with equal votes disagree, and whether a unit can be rented by the night.

So we draft the other way around. Your documents get what the statute requires, what your buyers' lenders and title company will look for, and the decisions that matter for your project, in plain English. Everything else we leave to the statute, which also keeps your documents current when the legislature changes the rules (as it did in 2025). If we can't explain why a provision is in your documents, it isn't. (Here are the main governing provisions of a typical declaration, marked up.)

The result is a shorter set of documents, built on our own short-form declaration, that you and your buyers can actually read, with nothing left out that the statute, your buyers' lenders or your title company needs.

What the full package includes

Not sure what each document does? Here's a plain-English rundown.

  • Condominium declaration. It meets every requirement of Tex. Prop. Code §82.055, with your surveyor's plats and plans attached.
  • Owners' association, formed for you. We prepare a certificate of formation for a Texas nonprofit corporation and file it with the Secretary of State, paying the $25 filing fee for you. County recording fees aren't included; you or your title company pay them when you record. (The association has to exist before you sell the first unit; §82.101.)
  • Bylaws. They're sized for a small association, including owners' meetings by phone or video (expressly authorized by Chapter 82 since September 1, 2025; §82.108(b-1)).
  • Organizational consent. It sets up the initial board, so the association starts out properly.
  • Management certificate. It's ready to record, with instructions for the required filing with the Texas Real Estate Commission within 7 days (§82.116).
  • Condominium information statement. You need it to sell units to the public (§§82.152–.153). We draft it for your review and adoption as declarant. The budget and the factual disclosures are yours, and we help you think them through.
  • A lender check. A short note tells you which Fannie Mae, Freddie Mac, FHA and VA rules apply to your project and how the documents handle them.
  • A one-page summary. It's in plain English, for buyers, agents and lenders.
  • A check of your recorded deed restrictions. We look for anything that would block a condo regime (send us your title commitment or the restrictions).
  • A recording package. It tells you what to sign, what to record, in what order, and with whom.
  • Follow-up. We answer your questions about your documents at no extra charge for 12 months after recording.

Not included

  • Plat, and plans for an attached condo. Every condominium needs a plat: a drawing of the property showing its boundaries, the buildings, and each unit's boundaries and number, prepared and certified by a Registered Professional Land Surveyor (Chapter 82 also lists engineers, §82.059(g), but a condo plat is a land survey). In an attached condo, each unit is bounded by its walls, floor and ceiling, so you'll also need plans: a simple drawing of each floor showing each unit's outline and its floor and ceiling elevations, certified by an independent licensed architect, engineer or surveyor. A detached (site) condo usually needs only the plat. (Which kind is mine?) Keep both simple. Building footprints and unit lines are all the law requires (interior walls and room layouts aren't, §82.059(e)), and leaving out interior detail avoids conflicts with your marketing materials and future remodels. We'll send your surveyor a checklist.
  • County recording fees. The county clerk charges by the page to record the declaration, plats and management certificate. You (or your title company) pay those when you record.
  • Lender consent. If the property has a mortgage, each lender has to consent to the declaration before you sell a unit (§82.051(b)). Recording the declaration without your lender's consent can also breach your deed of trust or other loan documents, which usually restrict transferring, dividing or further encumbering the property, and that can let the lender declare a default or call the loan due. We prepare and handle the consent for a fixed $950 per home mortgage ($1,500 for a construction, private or commercial lender).
  • A building condition report. If anyone, including you, has lived in or occupied a building before the condo is created, it's a conversion building, and the information statement needs a condition statement based on an independent architect's or engineer's report (§82.154). The report comes from your architect or engineer; coordinating it and drafting the required statements is a fixed $950.
  • Title insurance, zoning or tax advice, and FHA or VA project approval submissions. We're happy to quote any of these. We can also prepare unit deeds for your first sales at $450 each.
  • Anyone but you. We represent you as the owner and developer. We form the association for you, but we don't represent the association, its board after you turn over control, or your buyers.

Detached (site) condo or attached condo?

Every condo unit is drawn one of 2 ways. The choice decides who insures and maintains what, whether you need floor plans, and, for 5 or more units, what the documents cost.

Detached (site) condo

The unit is an area of land, often shaped like a small platted lot (a "site," which is why lawyers call it a site condo), and it includes the home and everything else inside its lines. Each owner insures and maintains its own home, the association looks after anything shared (a drive, a fence line), and dues stay low. Detached homes (a house plus an ADU, or 2 or more houses on one tract) are the usual detached (site) condos. FHA doesn't require project approval for a detached (site) condo where each owner insures and maintains its own home.

Attached condo

Everything else. The unit is the space inside its walls, floor and ceiling, and the structure, roof, yards and land are owned in common, with the association insuring and maintaining them under one policy. One home above another is always an attached condo, and a side-by-side duplex or a row of townhomes usually is too. Side-by-side homes can be drawn as a site condo, with the line between units down the shared wall, but then the shared wall, roof and foundation need their own rules for upkeep, insurance and rebuilding, and we'll talk that through with you first. An attached condo needs simple floor plans along with the plat.

Either way, the lot stays one lot. Anything inside a unit's lines belongs to that unit. Everything else is a common element, owned by all the owners together. A general common element, like a shared drive, the yard or (in an attached condo) the roof, is there for everyone. A limited common element, like a parking pad, patio or balcony, is still owned in common but reserved for one unit; the plat labels it with that unit's name. The association generally insures and maintains the general common elements, and each owner maintains its own unit and the limited common elements reserved for it.

A note on "duplex." It usually means one building with 2 homes, side by side or stacked, and it's usually an attached condo. 2 separate houses on one lot, or a house and a detached ADU, aren't a duplex; they're a 2-unit detached (site) condo.

An illustrative plat of a two-unit site condominium A single lot on Live Oak Street, not replatted, with its land divided by the condo documents into Unit A, a house and its yard, and Unit B, a detached ADU and its yard, with a shared drive along the street and a parking pad reserved for each unit. Pad A Pad B Shared drive House ADU Unit A house and yard Unit B ADU and yard N Live Oak Street Lot 7, Block 2: one lot, not replatted N 89°52′14″ E130.00′ S 89°52′14″ W130.00′ S 00°07′46″ E70.00′ An illustrative plat of a two-unit attached condominium A single lot on Live Oak Street, not replatted, with a side-by-side duplex. Unit A and Unit B are each the space inside one side's walls, floor and ceiling. The building shell (roof, outside walls and foundation), the shared water and sewer lines, the yard, the shared drive and the land are general common elements. The plat labels a parking pad and a patio for each unit as limited common elements. Lot 7, Block 2: one lot, not replatted Pad A Pad B Shared drive Patio A Patio B Unit A inside the walls Unit B inside the walls Shared water and sewer lines Building shell: roof, outside walls, foundation Yard N Live Oak Street N 89°52′14″ E130.00′ S 89°52′14″ W130.00′ S 00°07′46″ E70.00′

Unit A, owned by Owner A: its land and everything on it, including the house.

Unit B, owned by Owner B: its land and the ADU.

General common element: the shared drive. Both owners own it together, and both can use it.

Limited common elements: Pad A and Pad B. Both owners own them together, but the plat reserves each pad for the unit it names.

A house and a detached ADU on one lot. The lot isn't replatted: the condo documents divide it into 2 units, each with its own land. (Some cities and counties still treat a condo as a subdivision, so check first.) An illustration, not a real plat.A side-by-side duplex on one lot. The lot isn't replatted: the condo documents make the space inside each side of the building a unit, and everything else is shared. An illustration, not a real plat.

Add-ons, also at fixed prices

For the full package. Instant documents have one add-on: plat review, $750.

Lender consent

Each lender with a mortgage on the property consents to the declaration (§82.051(b)); recording without that consent can put your loan in default. Up to 2 rounds of lender comments; longer negotiations quoted separately.

$950 per home mortgage
$1,500 per construction, private or commercial lender

Condition-report coordination

For a conversion building (one anyone has occupied before the condo is created), you engage the independent architect or engineer; we coordinate the report with them and draft the statements §82.154 requires. Their fee is yours.

$950

Unit deeds

Deeds for your first sales, if your title company isn't preparing them.

$450 each
$350 each for 3 or more

Repeat projects

A repeat of a project we did for the same owner (or a company it controls) within the last 12 months, with the same layout. Choose it in the questionnaire and it's applied at checkout; we confirm it qualifies before our engagement begins.

$750 off the package fee

Rush

Drafts within 1 business day instead of 3, when our schedule allows. If we can't meet it, we refund the rush fee before the clock starts.

$750

Anything else

Work outside the package, quoted in writing before we do it.

TBD

For perspective, the City of Austin's fees for an infill plat that splits an existing lot come to about $11,100 on its FY 2026-27 schedule, before survey and engineering work. Houston's replat fees are lower, but a replat there often needs a public hearing. How a condo regime compares in Austin and in Houston.

Fees are as posted when you pay. We may change them at any time, but a change never affects a project you've already paid for. You pay online when you submit, the fee is held in our trust account and earned as the work is done, and it covers one condominium on one tract. Our engagement begins when we've cleared conflicts; if we find one, we refund you in full. Instant documents have their own terms: the fee is earned when they're delivered.

The 3 business days start when we have:

  1. Your completed questionnaire. Every required answer, including the names we need to check conflicts.
  2. Your documents. A current title commitment (it shows who signs and which lenders consent, and we read its Schedule B into the information statement), the deed to the property, and anything else the start page lists for your project, such as an LLC owner's formation documents.
  3. Your surveyor's certified plat. For an attached condo, the floor plans too. Drafts let us start reviewing, but the clock waits for the certified versions.
  4. Signed terms and payment. Accepted and paid online, and our conflicts check is clear. Our engagement begins then, and we'll email you the due date.

Then: drafts within 3 business days, and final documents usually within a business day or two of your sign-off. If anything is missing, the start page shows exactly what, and we'll tell you too. (Instant documents need only your answers and your title commitment: you download them when you pay.)

From first call to recorded regime

  1. Check fit (2 minutes) Answer the questions below. If your project fits, start it online; if it doesn't, we'll quote a fixed fee for custom work.
  2. Questionnaire Answer the questions online (unit layout, parking, yards, maintenance, insurance, rentals, who your buyers are likely to be). Your progress saves as you go, and you can come back to it.
  3. Documents Upload a current title commitment (it shows who signs and which lenders consent, and we read its Schedule B into the information statement), the deed that vested title in you, your surveyor's certified plats and plans, and anything else your answers call for. The page tells you exactly what's needed. We send your surveyor a checklist of what Chapter 82 requires.
  4. Terms and payment Accept the engagement terms online and pay the fixed fee through Square. We check for conflicts of interest right away; our engagement begins when they're cleared, and if we find one, we refund you in full.
  5. Drafts within 3 business days They're due 3 business days after the last of those 3 steps. We review and finalize the full set and walk you through it on a call. We adjust anything you want changed.
  6. Sign, form and record We file the association's certificate of formation. Then you sign the declaration (with any lender consent), and you or your title company record it with the signed, sealed and certified plat and plans and the tax certificates the county requires, followed by the management certificate. What recording takes.
  7. Sell You have the information statement and one-page summary for buyers, and a lawyer to call when questions come up.

Drafted for your buyers' lenders, where their rules apply

Your sales price depends on whether buyers can get loans, so we draft to Fannie Mae, Freddie Mac, FHA and VA requirements wherever they apply to your project, and we tell you up front which ones do. They don't all apply to every project, and the structure of the units often decides it:

  • Fannie Mae and Freddie Mac currently waive full project review for detached condo units, 2- to 4-unit projects, and 5- to 10-unit projects that aren't part of a larger development or master association. Some rules still apply, such as limits on how much of the association's lien can come ahead of the mortgage, and insurance requirements.
  • FHA doesn't require project approval for a "site condominium": detached homes, or side-by-side townhouse-style homes where each unit is the home plus its land, as long as each owner is responsible for the insurance and maintenance costs of their own home (other than landscaping). We draw the units so the project can qualify where its layout allows; the buyer's lender makes the call.
  • VA approves condominium projects as a whole after reviewing the legal documents, and it doesn't accept things like a right of first refusal on resales. We leave those out when VA buyers are in the picture.

Attached projects of 11 or 12 units don't get the Fannie Mae and Freddie Mac waiver; if yours is one, we'll tell you what full review involves before you engage us.

Two caveats. First, compliant documents and agency approval aren't the same thing: where FHA or VA approval is needed, it's a separate submission, usually by the buyer's lender. Second, if your buyers will pay cash or use jumbo or portfolio loans, the agency rules don't apply, and we won't load your documents with provisions you don't need.

Read more on lender rules for small Texas condos.

Does your project fit the fixed fee?

Thirteen quick questions. Your answers stay in your browser unless you choose to send them to us at the end.

1. Is the property in Texas?
2. How many units will there be in total?

Count every unit, including any you plan to keep.

3. How are the units laid out?

Side-by-side homes are usually an attached condo. A detached (site) condo is possible, but the shared wall and roof need extra provisions. Here's the difference.

4. Does any building have an elevator, a parking garage, or more than 4 stories?
5. Will every unit be residential?
6. Where is construction?
7. Might you want to add units, land or phases later?
8. Has anyone, including you, ever lived in or used any of the buildings?
9. Is there a mortgage or other lien on the property now?
10. Will owners share anything beyond the basics?

The basics are a driveway, parking, fences, landscaping, utility lines and mailboxes. Beyond the basics would be a pool, gate, private street, detention pond, or a shared septic system or well.

11. Is the property in an HOA or subject to deed restrictions?
12. How will most buyers likely pay?
13. Is the land leased (a ground lease) rather than owned?

Questions first?

The FAQ covers timing, cost, city approval, lenders, insurance and what happens with an existing mortgage. Or just call us.